The best interior chosen

21 September 2017
The Eurobuild Awards for Architecture were handed out during the second Eurobuild Architecture Festival on September 20th. There were five categories in the competition. Three projects reached the grand finals for The Workplace Solution of the Year award.

The Warsaw’s office of The Brain Embassy, at Al. Jerozolimskie 181B in Adgar Park West, with 1,500 sqm gla, was chosen by the jury as the Workplace Solution of the Year. Trzop Architekci studio designed the space that naturally enhances communication and community-building. The central point of the project is a patio in the form an urban square, with trees, comfortable sofas and wooden benches to encourage informal chats and meetings. The design attracted such interest from users that in August 2017 a second section to the project was opened. Both sections together comprise 3,600 sqm of working space. The general contractor was Artservis.

The design of the interior of the new Linklaters office, created by Dorota Kuć and Karina Snuszka of the Mood Works studio, was also among the finalists (the other companies involved in the project being Epstein and Pringle Brandon). The space was designed in such a way that a single office contains a greeting area, space for individual work that requires concentration and space for less formal team work, as well as a zone for relaxation and integration. The 2,500 sqm gla office is located on three floors of the Q22 building developed by Echo Investment.

Maciej Kurkowski and Julia Morawska are the creators of another of the nominated designs: the Miło headquarters, which is located in a tenement building at pl. Dąbrowskiego 8 in Warsaw. The building comprises 250 sqm gla of office space, which has been divided into a number of functional areas. The entrance, which is combined with a recreational and communication area, is notable for its special towelled concrete floor finished with a semi-matt resin. The floor forms a kind of ‘backbone’, with the rooms off it designated for quiet meetings with clients. The rooms have retained their original herringbone oak floors.

24th Annual Eurobuild Golf Tournament

24th Annual Eurobuild Golf Tournament

JUNE 6th, 2025,First Warsaw Golf,Rajszew
20th Eurobuild Summer Tennis Tournament

20th Eurobuild Summer Tennis Tournament

JUNE 6th, 2025,Klub Tenisowy Warszawianka,Warsaw
21st Cee Warehouse & Logistics Conference

21st Cee Warehouse & Logistics Conference

SEPTEMBER 26th, 2025,Wioślarska 8, 00-411 Warsaw,The Tides
The 3rd Architecture and Construction Festival
Nowogrodzka 84/86, Warsaw
PIN-UP Studio